title: "Awning & Patio Cover Permits, Reno-Sparks | Eikelberger"
url: "https://eikelbergerawningnv.com/blog/awning-and-patio-cover-permits-reno-sparks-washoe/"
canonical: "https://eikelbergerawningnv.com/blog/awning-and-patio-cover-permits-reno-sparks-washoe/"
updated: "2026-11-21"
breadcrumb: "Home > Blog > Awning & Patio Cover Permits in Reno, Sparks and Washoe County"
business: "Eikelberger Awning & Drapery Co."
what: "custom awnings (canvas, metal, retractable, window and patio), solar screens, motorization, commercial awnings and canopies, window shades and blinds, and custom canvas work - boat canvas, cushion upholstery, covers, tarps and sewing repairs - designed, made in the Sparks shop and installed"
phone: "(775) 358-1903"
email: "info@eikelbergerawning.com"
address: "1903 Hymer Ave., Sparks, NV 89431"
hours: "Mon-Fri 8:00 am-4:30 pm; closed Sat-Sun"
license: "Nevada contractor's license 0025300"
area: "Reno and Sparks, Nevada, and the surrounding areas, within a 100-mile radius (depending on the job)"
---

# Awning & Patio Cover Permits in Reno, Sparks and Washoe County

It depends on the structure and on where you live: Washoe County lists small wall-mounted window awnings that meet its conditions as exempt from permits, while patio covers go through a permit submittal with drawings and structural calculations. Eikelberger Awning & Drapery Co. designs, builds and installs awnings and patio covers in Sparks for Reno, Sparks and the surrounding area, and we check with the building department for each job.

Eikelberger Awning & Drapery Co. · 7 min read · Updated November 2026


Key points

- Washoe County lists window awnings projecting no more than 54 inches from the wall, under its conditions, as exempt work.
- Patio covers need a permit in the county, with drawings and structural engineering calculations in the submittal.
- Washoe County permits are submitted online at onenv.us.
- If your community has an architectural committee, its approval letter comes first.
- For Sparks, Carson City, Fernley and Fallon, we check with the city's building department.

This guide summarizes what Washoe County and the City of Reno publish, so you know the questions to ask before you build. It is a summary of public documents, not a ruling on your property, and the building department for your address has the final word.

## Small Window Awnings in Washoe County

Washoe County's "Work Exempt from Building Permits" handout lists, as item 12, window awnings "supported by an exterior wall that do not project more than 54 inches (1372 mm) from the exterior wall and do not project more than 24 inches (610 mm) into any setback and do not require additional support in Group R-3 and U occupancies only." In the Tahoe basin, the item adds a condition about visibility from a TRPA-defined corridor.

The handout opens with an important line: exemptions from permit requirements "shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances." So an exempt awning still has to meet the code, and your own wall, setbacks and community rules still apply. This list is for unincorporated Washoe County, such as Spanish Springs, Lemmon Valley, Verdi and Washoe Valley.

## Patio Covers in Washoe County

Washoe County's "Decks & Patio Covers: Required Submittal" handout lists what a permit package includes. The drawings are a site plan, foundation and footing details, elevations and sections, and roof framing. The documents are a completed application, structural engineering calculations, an HOA letter if applicable and TRPA approval if applicable. The handout says plans must be prepared by a Nevada licensed design professional, a contractor under the provisions of NRS 623 drawing for his own construction work, or an owner-builder with an affidavit.

On engineering, the handout says structural engineering is strongly recommended for all patio covers and decks, and it is required when the ground snow load is more than 70 pounds per square foot, when the design exceeds the prescriptive requirements, or when a braced wall line exceeds 25 feet. Since June 1, 2020, Washoe County building permit submittals are electronic and online only, through onenv.us.

## HOA and Architectural Committee Approval

If your home is in a community with an architectural committee, approval comes before the permit. The county's handout says that under NRS 278.563, the committee must be registered with the county or hold an exemption certificate, and that an architectural committee letter of approval is required before plans go to the Building Program.

In practice, that means you ask your association first. A letter from the committee goes in with the plans. If you are not sure whether your neighborhood has a committee, your closing documents or the association can tell you.

## The City of Reno

The City of Reno's building permits page says the 2024 Building Codes along with the 2023 NEC were adopted on July 1, 2025, and that from January 1, 2026, plans are accepted only under the 2024 edition. For work exempt from permit, the city points to Section 105.2 of the International Building Code and, for one- and two-family dwellings, Section R105.2 of the International Residential Code. The page also lists a Patio Cover Design Guide among its resources.

We read those sections as a starting point and then confirm with the city's building staff for your address, because an exemption in the code often comes with conditions. If a project is in the City of Reno, the city's rules apply, not the county's.

## Sparks, Carson City, Fernley and Fallon

Each city in northern Nevada runs its own building department with its own forms and codes. For Sparks, Carson City, Fernley and Fallon, we check with the city's building department for each job so you get the rule that applies at your address instead of a general answer.

Commercial awnings and canopies are reviewed too. Our guide to [awning fabric](https://eikelbergerawningnv.com/blog/awning-fabric-guide/) covers the IBC fabric rule that applies to them.

## Questions to Ask Before You Build

A short list gets you a clear answer from the building department or your association.

- Is my address in the City of Reno, Sparks or unincorporated Washoe County?
- Does this awning or cover need a permit, and under which section?
- How far will it project from the wall, and how far into any setback?
- Will it need plans, engineering or a snow load value for my parcel?
- Does my neighborhood have an architectural committee, and what does it need to see?

Our guide on [what goes into the cost of a custom awning](https://eikelbergerawningnv.com/blog/what-goes-into-the-cost-of-a-custom-awning/) shows where plans and engineering fit in the overall project. See [window and door awnings](https://eikelbergerawningnv.com/window-awnings/) and [patio covers and patio shades](https://eikelbergerawningnv.com/patio-covers/) for what we make.

### Sources (3)

- Washoe County : [washoecounty.gov/building/Files/Files/Handouts/Work%20Exempted%20from%20Permits-MH%20final](https://www.washoecounty.gov/building/Files/Files/Handouts/Work%20Exempted%20from%20Permits-MH%20final.pdf) (checked November 2026)
- Washoe County : [washoecounty.gov/building/Files_2020/Decks-and-Patio-Covers-handout-2022.pdf](https://www.washoecounty.gov/building/Files_2020/Decks-and-Patio-Covers-handout-2022.pdf) (checked November 2026)
- City of Reno : [reno.gov/business-development/development-services/building-permits.php](https://reno.gov/business-development/development-services/building-permits.php) (checked November 2026)

## Related Questions

### Do I need a permit for a window awning in Washoe County?

The county lists window awnings projecting no more than 54 inches from the exterior wall, and no more than 24 inches into any setback, with no additional support, in Group R-3 and U occupancies as exempt work. Your building department confirms whether your awning meets those conditions.

### Does a patio cover need a permit?

In Washoe County, patio covers go through a permit submittal with a site plan, foundation details, elevations, roof framing and structural engineering calculations. Check with the building department for your address before building.

### Do I need HOA approval first?

If your community has an architectural committee, Washoe County's handout says the committee's letter of approval is required before plans are submitted. Ask your association.

### What about Sparks, Carson City, Fernley and Fallon?

We check with the city's building department for each job, since each city has its own forms and codes.

### Can the building department change these rules?

Yes. Codes are updated, as the City of Reno's move to the 2024 codes shows, so we confirm the current rule at the start of each project.