---
title: "Fire-Rated Fabric for Commercial Awnings | Eikelberger"
url: "https://eikelbergerawningnv.com/blog/fire-rated-fabric-for-commercial-awnings/"
canonical: "https://eikelbergerawningnv.com/blog/fire-rated-fabric-for-commercial-awnings/"
updated: "2026-11-21"
breadcrumb: "Home > Blog > Fire-Rated Fabric for Commercial Awnings"
business: "Eikelberger Awning & Drapery Co."
what: "custom awnings (canvas, metal, retractable, window and patio), solar screens, motorization, commercial awnings and canopies, window shades and blinds, and custom canvas work - boat canvas, cushion upholstery, covers, tarps and sewing repairs - designed, made in the Sparks shop and installed"
phone: "(775) 358-1903"
email: "info@eikelbergerawning.com"
address: "1903 Hymer Ave., Sparks, NV 89431"
hours: "Mon-Fri 8:00 am-4:30 pm; closed Sat-Sun"
license: "Nevada contractor's license 0025300"
area: "Reno and Sparks, Nevada, and the surrounding areas, within a 100-mile radius (depending on the job)"
---

# Fire-Rated Fabric for Commercial Awnings

Under the 2024 International Building Code, Section 3105.3, an awning or canopy needs an approved covering that passes the NFPA 701 fire propagation test, has a flame spread index of 25 or less, or meets the NFPA 286 criteria, and the rule does not apply to awnings on detached one- and two-family homes. Eikelberger Awning & Drapery designs, makes and installs commercial awnings and canopies in Reno, Sparks and northern Nevada, and on a commercial job the fabric's fire-test documentation is part of choosing it.

Eikelberger Awning & Drapery Co. · 6 min read · Updated November 2026


Key points

- IBC 2024 Section 3105.3 sets fire-performance rules for awning and canopy coverings.
- Three paths: NFPA 701 Test Method 1 or 2, a flame spread index of 25 or less (ASTM E84 or UL 723), or NFPA 286 criteria.
- The fire requirements do not apply to awnings on detached one- and two-family dwellings.
- Ask for the fabric's spec sheet and keep it with the job file.
- Section 3105.2 adds wind, lateral and live loads.

If you own a storefront, restaurant or office, the fabric on your awning is part of the building's fire safety, not just its look. Here is what the code language says, in plain terms, and what to ask a supplier for.

## What Does the Building Code Say About Awning Fabric?

The 2024 International Building Code, in the Nevada edition published on UpCodes, says in Section 3105.3: "Awnings and canopies shall be provided with an approved covering that complies with one of the following." There are three options.

First, the covering meets "the fire propagation performance criteria of Test Method 1 or Test Method 2, as appropriate, of NFPA 701." Second, it "has a flame spread index not greater than 25 when tested in accordance with ASTM E84 or UL 723." Third, it meets the criteria when tested in accordance with NFPA 286, including that during the 40 kW exposure flames shall not spread to the ceiling.

| Path | Test | What the code requires |
|---|---|---|
| 1 | NFPA 701, Test Method 1 or 2 | Meet the fire propagation performance criteria for the method that applies |
| 2 | ASTM E84 or UL 723 | A flame spread index not greater than 25 |
| 3 | NFPA 286 | Meet the listed criteria, including no flame spread to the ceiling during the 40 kW exposure |

## Does This Apply to a House?

Not to a detached one- or two-family home. The same section includes an exception: the fire propagation and flame spread requirements "shall not apply to awnings" installed on detached one- and two-family dwellings. Storefronts, restaurants, offices, apartments and other commercial or multifamily buildings are where the fabric test matters.

For a business, that means the fabric you choose should come with a test result behind it, not just a color card. Some businesses have a landlord or a property manager who asks for that paper before an awning is approved.

## What Else Does Section 3105 Cover?

Section 3105.2 says awnings and canopies "shall be designed and constructed to withstand wind or other lateral loads and live loads" as required by Chapter 16, with allowance for shape, open construction and similar features. So the fabric is one part. The frame, the attachment to the building and the loads it carries are the other.

Which values apply depends on where the building stands, and the local building department reads them for each project. We check with your city or county building department before we build, so the awning is designed to the right numbers.

## What Should You Ask a Supplier For?

Bring a short list to the awning company you choose.

- Ask for the fabric's spec sheet showing which of the three paths it meets.
- Ask that the sheet be kept with your job file so you can show it to a landlord, insurer or inspector.
- Confirm the frame and anchoring are designed for wind and live loads under Section 3105.2.
- Ask who will check with the building department, and when.
- If the awning will carry your name or logo, ask how the lettering and the fabric fit together, so a change in artwork does not change the fabric.

## What Eikelberger Does

We design, manufacture in our Sparks shop and install commercial awnings and canopies with name, logo and lettering, plus custom and prefabricated canopies. See [storefront, office and restaurant awnings](https://eikelbergerawningnv.com/commercial-awnings/), [storefront and logo awnings](https://eikelbergerawningnv.com/commercial-awnings/storefront-awnings/) and [restaurant and outdoor dining awnings](https://eikelbergerawningnv.com/commercial-awnings/restaurant-patio-awnings/). We accurately measure all projects to be custom-made for precision and functionality, and we install to the exacting specifications that our discriminating customers demand. Call for a free analysis and estimate and tell us what the building needs.

### Sources (2)

- International Building Code 2024 (Nevada), UpCodes : [up.codes/viewer/nevada/ibc-2024/chapter/31/special-construction](https://up.codes/viewer/nevada/ibc-2024/chapter/31/special-construction) (checked November 2026)
- Eikelberger Awning & Drapery Co. : [eikelbergerawningnv.com/](https://eikelbergerawningnv.com/) (checked November 2026)

## Related Questions

### What is NFPA 701?

It is a fire test standard. The 2024 International Building Code lists its Test Method 1 or Test Method 2 as one of three ways an awning or canopy covering can show fire performance.

### Does my home awning need fire-rated fabric?

The code's fire-performance requirements do not apply to awnings on detached one- and two-family dwellings. We still check with your building department on any permit questions.

### What is a flame spread index of 25?

It is the second option in Section 3105.3: a covering with a flame spread index not greater than 25 when tested in accordance with ASTM E84 or UL 723.

### How do I show the fabric meets code?

Ask for the fabric's spec sheet or fire-test documentation from the fabric maker, and keep a copy with your building records.

### Who decides what applies to my building?

Your city or county building department. We check with the department for each job before we build.

[More questions and answers](https://eikelbergerawningnv.com/faq/)
